Manufacturing hub
Acumatica manufacturing help, from people who configure the screens.
MRP that does not plan what you expect. Costs that post at zero. Production documents that block month-end. Most of it comes down to one field.
Why it happens in Acumatica
The Manufacturing Edition is driven by master data. Item class decides how demand flows. The BOM and its revision decide cost. An item set up wrong will quietly break planning three levels down, and it will look like a system limitation. It almost never is.
How we work a manufacturing problem
Reproduce it in a sandbox with a real order.
Trace it to the item class, the BOM, the order type or the setting.
Fix it, then test the step everyone assumes is working.
Write the SOP with the person who does the job, and get it signed.